Section 6 - Storage
Page 140
90-8M0050539
eng
MAY 2011
14. Before launching the boat, pull up on the manual release valve. Verify that the green indicators are no longer extended.
a -
Green indicators
15. Open the seacock, if equipped, or unplug and reconnect the water inlet hose prior to operating the engine.
Boat out of the Water
NOTE: This procedure is written for the air pump that is attached to the engine. However, any air source can be used.
1. Place the boat on a lever surface to ensure complete draining of system.
2. Remove the air pump from the engine.
3. Ensure that the lever on top of the pump is flush with the handle (horizontal).
4. Install the air pump on the actuator fitting.
5. Pull lever on air pump (vertical) to lock pump on the fitting.
a -
Actuator fitting
b -
Green indicators
c -
Manual release valve
d -
Air pump
e -
Lever (locking)
a
6135
8293
b
d
e
a
c
Summary of Contents for MerCruiser Axius SeaCore 350 MAG
Page 28: ...Section 1 Warranty Notes Page 20 90 8M0050539 eng MAY 2011...
Page 56: ...Section 2 Getting to Know Your Power Package Notes Page 48 90 8M0050539 eng MAY 2011...
Page 70: ...Section 3 On the Water Notes Page 62 90 8M0050539 eng MAY 2011...
Page 162: ...Section 7 Troubleshooting Notes Page 154 90 8M0050539 eng MAY 2011...