Installation manual
M-WRG-S/Z-S, M-WRG-S/Z-24,
M-WRG-S/Z-EIB, M-WRG-S/Z-KNX (-F, -FC)
- 20 -
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
V E N T I L AT I O N & H E AT R E C O V E R Y
8.4
Fixing the EIB universal interface 6119/40 in the ventilation unit and
connecting the EIB bus cable
8.4.1 Fixing the EIB universal interface 6119/40 to the network connection cover
►
Thread the EIB bus cable through the
opening (item 1 in Fig. 12) in the network
connection cover.
►
Re-insert the network connection cover
(item 2 in Fig. 12).
►
Pull the glue dot off the Velcro dot (item 3
►
Fix the EIB universal interface to the Vel-
cro dot.
8.4.2 Connecting the EIB bus cable to the EIB universal interface 6119/40
►
Connect the EIB bus cable to the EIB uni-
versal interface 6119/40, ensuring that the
polarity is correct:
►
Connect the “+” bus wire to the red
terminal (item 1 in Fig. 13).
►
Connect the “-” bus wire to the grey
terminal (item 2 in Fig. 13).
NOTE
The EIB universal interface will not work if the bus
cables are connected with the wrong polarity.
8.5
Programming the EIB universal
interface 6119/40
►
The EIB universal interface 6119/40 must
be programmed by the electrician on site.
8.6
Final tasks
►
Attach the cover to the ventilation unit (see section 6.3.4 on page 12).
1
2
3
Fig. 12: Fixing the EIB universal interface 6119/40 to
the Velcro dot
Fig. 13: Connecting the EIB bus cable to the EIB
universal interface 6119/40
1
2