Rev A04
Mellanox Technologies
4
Chapter 4 Chassis Installation
4.1.1 Assembling and Mounting the Rails
4.1.2 Mounting the Chassis in the Rack
4.1.3 Installing Cabling Guide Brackets
4.2 Shipping Guidelines and Instructions
5.3 Extracting/Inserting Boards
5.3.1 Installing a Fabric Board (sFB-8500)
5.3.2 Extracting a Fabric Board (sFB-8500)
5.3.3 Installing a Line Board (sLB-1024)
5.3.4 Extracting a Line Board (sLB-1024)
5.3.5 Installing a Management Board (sMBE)
5.3.6 Extracting a Management Board (sMBE)
5.4 Installing a Power Supply Unit (sPSU-S)
5.5 Extracting a Power Supply Unit (sPSU-S)
5.6 Replacing a Control Board (sCTRL)
5.7 Replacing Fan Units (sFUs)
Chapter 6 Connector and Cable Specifications
6.4 Connecting the Unit to a Local Management Terminal
Chapter 7 Final Checks, Operation and Troubleshooting
7.1 Required Checks Before Initial Operation
7.3 Verifying Proper Switch Operation
7.4 Checking the LED Indicators
7.4.1 Line Board (sLB-1024) LED Indicators
7.4.2 Fabric Board (sFB-8500) LED Indicators
7.5 Power Supply Unit (sPSU-S) LED Indicators
7.5.2 Management Board (sMBE) LED Indicators