MELTER OPERATION
4-3
MA-5184-ENG
PUR LC/MC ADHESIVE MELTER
image (2).
3. Lift the air-tight tank lid using the handle (2)and put it on its maximum
position. A blocking fastener fix it to remain opened.
4. To close the air-tight, unlock the fixing mechanism, holding the lid with
the other hand.
5. Turn the handle in clockwise sense to fix it.
6. Close the outer lid.
When the system detects the outer lid closed acts as follows:
1. With the exhaust valve opened, it is injected dry air for 0.5 min. This
restores the air into the tank.
2. The exhaust valve is closed and continue the injection of air for 0.5 min.
This refills the tank with dry air to the pressure regulated.
3. The injection valve is closed and starts the automatic cycle.
2
1
3
output valve
Summary of Contents for Micron PUR LC
Page 1: ...ADHESIVE MELTER MICRON PUR LC MC INSTRUCTIONS MANUAL MA 5184 GBR 010920 GLUING SOLUTIONS ...
Page 20: ...This page is intentionally left blank MELER GLUING SOLUTIONS 2 8 INTRODUCTION ...
Page 34: ...MELER GLUING SOLUTIONS INSTALLATION 3 14 This page is intentionally left blank ...
Page 84: ...MELER GLUING SOLUTIONS 5 10 MAINTENANCE Esta página no contiene texto ...
Page 90: ...MELER GLUING SOLUTIONS 7 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Page 94: ...MELER GLUING SOLUTIONS 9 2 SPARE PARTS LIST This page is intentionally left blank ...