www.megger.com
PAT400 Series
19
.4
Press the DOWN arrow to access TEST GROUPS.
.5
Press OK to access the drop down list of test groups.
Use the UP/DOWN arrows to scroll through the list of test groups and then press OK
OR
Start typing the name of the test group. The cursor will jump to the relevant test groups with that letter or number. Entering
more than one letter will refine the search further. Then press OK.
Add any additional data in the available fields as required.
.6
Press TEST to commence testing.
.7
Go to section 3.3 Test Progress
Note: Only a TEST GROUP is required to start testing.
On completion of a test, only Asset IDs and Test groups have to be added before the test is completed. All other data
is
optional.
NOTE: If NO Asset ID is entered, press the Test Group Hotkey
and type in the test group.
Alternatively press the
hotkey twice to select the test group drop down box. Press OK to list all test group
options, scroll down the list to select desired test group and press OK to accept.
NOTE: Pressing the Right arrow key will “Page Down” the list.
FURTHER DETAILS ON ADDING ASSETS CAN BE FOUND IN SECTION 5.