![mecalac AS 50 Operating Instructions Manual Download Page 59](http://html1.mh-extra.com/html/mecalac/as-50/as-50_operating-instructions-manual_1758747059.webp)
S45E/S45T/Z45T
7-5
Rescue, towing, lashing,
7
lifting by crane
(10) Attach the towing rod to the loader to be towed
[(7-2/1 - towing forwards) or (7-5/1 - towing backwards)] and
to the towing vehicle.
CAUTION
If the loader does not have a forward ranging and towing
coupling, the loader must only be towed backwards.
(11) Switch the hydrostatic drive motor to free flow before
towing. For this purpose loosen the hexagon lock nuts.
Screw the pins at both high pressure relieve valves (7-3/
arrows - slow loader) or (7-4/arrows - fast loader) of the drive
pump until they are level to the hexagon lock nuts. After
that fasten the lock nuts again.
N O T E
After towing procedure loosen the hexagon lock nuts.
Screw the pins out of both high pressure relieve valves until
the pins stop. Fasten the lock nuts.
(12) If necessary, remove the chocks.
(13) Release the parking brake (4-7/14).
DANGER
- Tow the loader at walking speed (2 km/h) with the engine
running.
- The towing distance should not exceed 1 km.
- For a longer distance, the defective loader must be
loaded onto a truck (for the lashing points, see 7-2/1 and
7-2/2, 7-5/1 and 7-5/2).
N O T E
See page 7-4 for the max. permitted load of the lashing/
load-bearing points.
7.2
Lifting by crane
The loader to be lifted is to be prepared as follows:
(1) Set the drive switch (4-7/13) to the “0” position.
(2) Set transmission stage "I" (4-7/11).
(3) Set the parking brake (4-7/14).
(4) Remove the cover plate in the swivel unit (7-6/arrow).
(5) Lift or lower the bucket arm until the lowest point of the
bucket arm or the bucket is at least 30 cm above the road
(5-2).
(6) Close the ball block valve (1-2/arrow) for the working
and auxiliary hydraulics.
(7) Block the swivel mechanism by inserting the blocking
wedge (1-3/arrow) in the swivel blocking mechanism (1-4/
arrow).
(8) Lock the doors.
(9) Fold the outside mirror inwards.
Figure 7-6
Summary of Contents for AS 50
Page 8: ......
Page 9: ...Safety regulations ...
Page 21: ...Signs ...
Page 24: ......
Page 25: ...Protection against theft ...
Page 28: ......
Page 29: ...Description ...
Page 38: ......
Page 39: ...Operation ...
Page 48: ......
Page 49: ...Attachments ...
Page 55: ...Rescue towing lashing lifting by crane ...
Page 61: ...Maintenance ...
Page 62: ......
Page 77: ...Malfunctions causes and remedies ...
Page 80: ......
Page 81: ...WiringandHydraulics ...
Page 82: ......
Page 84: ......
Page 88: ......
Page 89: ...Technical Data Loader ...
Page 93: ...TechnicalData Attachments ...
Page 100: ......
Page 101: ...Optional Extras Changes ...
Page 103: ...S050 S051 Z050 13 3 Optional Extras Changes 13 ...
Page 104: ...S050 S051 Z050 13 4 13 Optional Extras Changes ...
Page 105: ...S050 S051 Z050 13 5 Optional Extras Changes 13 ...
Page 106: ...S050 S051 Z050 13 6 13 Optional Extras Changes ...
Page 107: ...S050 S051 Z050 13 7 Optional Extras Changes 13 ...
Page 108: ...S050 S051 Z050 13 8 13 Optional Extras Changes ...
Page 109: ...S050 S051 Z050 13 9 Optional Extras Changes 13 ...
Page 110: ...S050 S051 Z050 13 10 13 Optional Extras Changes ...
Page 111: ...S050 S051 Z050 13 11 Optional Extras Changes 13 ...
Page 112: ...S050 S051 Z050 13 12 13 Optional Extras Changes ...
Page 113: ...S050 S051 Z050 13 13 Optional Extras Changes 13 ...
Page 114: ...S050 S051 Z050 13 14 13 Optional Extras Changes 23128023 KL A 31216 ...