Installation manual - Eletta
®
- 39
4.2 Quick cable release system
This system allows to remove the lateral
steel cable by setting the upper edge free
and making possible to tip sideward or to
swing out the board walls. Of course,
removing the steel cable following the
standard procedure would be infeasible.
For this reason, we developed the cable
quick release system. It differs from the
standard system in the following items:
•
the rear guide pulley;
•
the tightening system of the steel
cable.
Hereinafter the description of the operations for mounting the accessory equipment which makes the quick release of the
steel cables possible.
4.2.1 Installation of the rear guide pulley
In the quick cable release system, the plate with the rear guide pulley is the component which differs from the standard
system. For carrying out the installation proceed as follows:
•
Pay close attention while choosing the installation position in order to avoid to form any obstacle for mobile elements as
the tailgate. The best position for the plate is the one as close as possible to the rear board, but at a sufficient distance
for avoiding to be an obstacle for hinges.
WARNING!
A wrong positioning of the tension plate could be cause of damages for the covering or for the tipper
body.
In case of any doubt, we recommend to make some movement tests on the rear movable parts to avoid
any bad surprise.
•
For a proper working of the covering system position the plate the highest
possible (accordingly to the board wall type).
•
Drill the four holes Ø 8, tap and screw on the plate with the supplied screws.
•
Apply Loctite
®
screwlock liquid.
•
If the thickness of the board wall should be less than 6 mm use through bolt with
washer and locking nuts (not included in the equipment).
Note:
The proper positioning of the rear guide pulleys is binding for the positioning of the subsequent elements.
•
Repeat now the plate fastening operation on the opposite board wall.
The support can also be
installed vertically.
TIGHT CABLE