Page 69
Version 2023-07-27
Fire damper - FDMQ
TPM 103/14
EIS 90
1
FDMQ
2
Installation frame - apply HILTI CFS-S ACR mastic at the entire area and
glue it to the fire separating construction
3
Standard air duct, made of galvanized sheet metal min. thickness 0,8 mm
4
Solid ceiling construction
5
Concrete B20
6
Rebar - steel rod Ø 6 mm, mesh hole 100 mm
7
Holes for fixing the frame with threaded rods or steel anchors (frame
fixing material not included)
50...150
≥
1
1
0
*
≤
7
5
0
50...150
1
0
0
≥
100
30
A
A
B
A
min. A+100
max. A+300
m
in
.
B
+
1
0
0
m
a
x
.
B
+
3
0
0
* min. 110 mm - Concrete
min. 125 mm - Aerated concrete
■
For connection of following duct
■
The duct must be suspended or supported on both sides of the damper acc. to national rules
■
Load of the suspension system depends on weight of the fire damper and duct system
■
Max. distance between two suspension systems is 1500 mm
■
Following air-conditioning duct must be suspended or supported so that all load transfer from the following duct to the fire damper is
absolutely excluded. Adjacent duct must be suspended or supported, as required by the duct suppliers
■
Installation frame can be installed on the damper or delivered separately
Outside solid ceiling construction - concreting - installation frame E4