Fire damper - FDMQ
Page 68
Version 2023-07-27
TPM 103/14
EIS 90
B+164
4 x
Ø
12
B
A
A
+
1
6
5
≥
1
1
0
*
A(B)+5
+3
(installation opening)
1
1
5
■
For connection of following duct
■
Installation frame can be installed on the damper or delivered separately
In solid ceiling construction - installation frame E4
* min. 110 mm - Concrete
min. 125 mm - Aerated concrete
1
FDMQ
2
Installation frame - apply HILTI CFS-S ACR mastic at the entire area and
glue it to the fire separating construction
3
Duct
4
Profile with threaded rod
5
Solid ceiling construction
6
Holes for fixing the frame with threaded rods or steel anchors
(material for fixing the frame is not included)