Page 57
Version 2023-07-27
Fire damper - FDMQ
TPM 103/14
Installation frame E1
■
Installation frame E1 is designed for installation without additional sealing of the penetration into:
■
Solid wall construction
■
Gypsum wall construction
■
Solid ceiling construction
■
Installation frame is equipped with an intumescent sealing on the inside and outside. This sealing fills the gap between the
damper casing and frame and between the frame and construction in the event of a fire
Solid wall/gypsum wall th. 100 mm or solid ceiling th. 110 mm
■
Material:
■
Installation frame - cement-lime boards
■
Fasteners - galvanized steel
Installation frame E1
100
110
B
+
1
2
4
A+124
A+104
B
+
1
0
4