Fire damper - FDMQ
Page 56
Version 2023-07-27
TPM 103/14
Installation frames
■
Installation frame can be installed on the damper or delivered separately
List of installation frames and installation options
Installation
frame
Wall thickness (mm)
Solid wall construction
Gypsum wall construction
Solid ceiling construction
In
construction
Outside
construction
On
construction
In
construction
Outside
construction
On
construction
In
construction
Outside
construction
On
construction
E1
≥ 100
–
–
≥ 100
–
–
≥ 110/125
–
–
E2
≥ 100
–
–
–
–
–
≥ 110/125
–
–
E3
–
–
–
≥ 100
–
–
–
–
–
E4
–
–
≥ 100
–
–
≥ 100
–
≥ 110/125
≥ 110/125
E5
–
–
–
≥ 100
–
–
–
–
–
E6
–
≥ 100
–
–
–
–
–
≥ 110/125
–
Installation frame E5
Installation frame E6
Installation frame E1
Installation frame E2
Installation frame E3
Installation frame E4