Page 65
Version 2023-07-27
Fire damper - FDMQ
TPM 103/14
EIS 90
1
FDMQ
2
Installation frame
3
Bracket with fasteners (delivered with frame)
4
Mounting of the damper to the frame (delivered with frame)
5
Fill the gaps with glue PROMAT K84
6
Duct
7
Profile with threaded rod
8
Gypsum wall construction
A
(B
)+
1
0
7
+
3
(i
n
s
ta
lla
ti
o
n
o
p
e
n
in
g
)
A
A+107
+3
(installation opening)
A+112
B
B
+
1
0
7
+
3
(i
n
s
ta
lla
ti
o
n
o
p
e
n
in
g
)
B
+
1
1
2
≥
100
X
X
Side A
Number of
brackets
ZA
Side B
Number of
brackets
ZB
A ≤ 500
4
B ≤ 500
0
500 < A ≤ 1000
6
500 < B ≤ 800
4
1000 < A ≤ 1500
8
Number of brackets X = ZA + ZB
Number of screws Y = 2 x X
In gyspum wall construction - installation frame E3
■
For connection of following duct
■
Installation frame can be installed on the damper or delivered separately