background image

TPM 083/12

8

Park Allé 366, DK-2605 Brondby
Telefon 70 20 19 11; E-mail:[email protected]

5. Statement of installations

5.1. 

 

Statement  of installations

Tab. 5.1.1.  Statement  of installations

Damper 

size

FDMC installation

Classifi-

cation

Figure

100-400 

Damper installed on a solid wall construction. Space between damper and 

wall is filled by mortar, gypsum or another approved fire sealing system 

for damper installation.

EIS 60

7

Damper installed on a gypsum wall construction. Space between damper 

and wall is filled by mortar, gypsum or another approved fire sealing 

system for damper installation.

EIS 60

8

Damper installed on a solid ceiling construction. Space between damper 

and ceiling is filled by mortar, gypsum or another approved fire sealing 

system for damper installation.

EIS 60

9

Duct ended by installation shaft. Space between damper and ceiling is 
filled by mortar, gypsum or another approved fire sealing system for 

damper installation - solid wall construction

EIS 60

10

Duct ended by installation shaft. Space between damper and ceiling is 
filled by mortar, gypsum or another approved fire sealing system for 

damper installation - gypsum wall construction

EIS 60

11

Fig. 7 

Installation on a solid wall construction

Position:

1

Fire damper FDMC

2

Mortar or gypsum with min. density 800 kg/m

3

 or another approved fire 

sealing system for damper installation

2

1

2

1

Summary of Contents for FDMC

Page 1: ...FDMC FDMC SRD TPM 083 12 DK VALID FROM 15 1 2012 FIRE DAMPER AND FIRE DAMPER SMOKE RELIEF...

Page 2: ...ription 3 2 Design 4 3 Dimensions weights 5 4 Placement and Assembly 6 5 Statement of installations 8 III TECHNICAL DATA 9 6 Pressure loss 9 7 Coefficient of local pressure loss 10 8 Noise data 10 9 E...

Page 3: ...N 13501 3 and tested acc EN 1366 2 1 5 Dampers have one inspection hole since the shutting device and the inspection hole can be set into the most advantageous position with respect to the operation a...

Page 4: ...of the actuating mechanism These fuses are activated when temperature 72 C has been exceeded the fuse Tf1 when the temperature around the damper and the fuses Tf2 Tf3 when the temperature inside the...

Page 5: ...1 E mail oeland oeland dk Position 1 Damper body 4 BAE 72B S thermoelectrical starting mechanism 2 Damper blade 5 Inspection hole covering 3 Actuating mechanism Fig 2 Fire damper FDMC Fig 3 Fire dampe...

Page 6: ...a 4 Placement and Assembly 4 1 Fire dampers are suitable for installation in arbitrary position in vertical and horizontal passages of fire separating constructions Damper assembly procedures must be...

Page 7: ...mper body during opening or closing 4 7 Installation opening dimensions 4 2 To provide needed access space to the control device all other objects must be situated at least 350 mm from the control par...

Page 8: ...tallation EIS 60 8 Damper installed on a solid ceiling construction Space between damper and ceiling is filled by mortar gypsum or another approved fire sealing system for damper installation EIS 60 9...

Page 9: ...min density 800 kg m3 or another approved fire sealing system for damper installation Fig 8 Installation on a gypsum wall construction 2 1 2 1 Fig 9 Installation on a ceiling wall construction 1 2 2 1...

Page 10: ...t solid wall construction 4 Position 1 Fire damper FDMC 3 Duct 2 Mortar or gypsum with min density 800 kg m3 or another approved fire sealing system for damper installation 4 Installation shaft 3 1 2...

Page 11: ...oss for the nominal damper section see Tab 7 1 1 III TECHNICAL DATA 6 2 Determination of pressure loss by using diagram 6 2 1 1 2 kg m 3 Diagram 6 2 1 Pressure losses for air density 1 2 kg m 3 7 1 Co...

Page 12: ...see Tab 8 3 3 LWoct LW1 10 log S Lrel 8 3 Table of acoustics values Tab 8 3 1 Level of acoustic output LW1 related to the 1 m2 section w m s 1 0 1 0 2 0 3 0 4 0 6 0 8 1 1 5 2 2 5 3 3 5 2 9 0 11 5 14 7...

Page 13: ...l 48 8 10 log 0 0374 11 5 23 1 dB Tab 8 3 2 Correction to the weight filter A w m s 1 2 3 4 5 6 7 8 9 10 11 12 KA dB 15 0 11 8 9 8 8 4 7 3 6 4 5 7 5 0 4 5 4 0 3 6 Tab 8 3 3 Relative level expressing t...

Page 14: ...oring holding 5 W 2 5 W Dimensioning 7 VA Imax 5 8 A 5 ms Protection Class III Degree of protection IP 54 Running time motor spring return 40 75 s 20 s Ambient Temperature normal duty safety duty non...

Page 15: ...e fire damper function it is necessary to avoid blocking the closing mechanism and contact surfaces with collected dust fibre and sticky materials and solvents 13 Logistic terms 13 1 Dampers are trans...

Page 16: ...ile he is obliged to provide the fire protection another appropriate way 15 2 Before entering the dampers into operation after their assembly and by sequential checks the following checks must be carr...

Reviews:

Related manuals for FDMC