4
MPT-333
Contents
Receipt of goods, transport and storage
Unpacking, scope of delivery and identification
Specifying the installation position
Setting up foundation and placing empty conduits
Setting up foundation and placing empty conduits 35
Foundation and empty conduit plan for base frame
Foundation and empty conduit plan
Assembling and mounting the base frame
Preliminary work for installation directly on the foundation
Assembling the locking comb and cage half
Assembly of an optional mounting pillar
Summary of Contents for MPT-333
Page 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Page 89: ...89 MPT 333...
Page 90: ...90 MPT 333...
Page 91: ...91 MPT 333...