43
MPT-333
Assembly
7.7
Preliminary work for installation directly on the foundation
Prerequisites
›
The conduits have been placed.
›
The foundation has cured.
IMPORTANT!
Observe the separate instructions as well as the packaging in-
scriptions for the attachment material.
1. Mark holes for sleeve with inner thread. A drilling template is included in
the scope of delivery.
ä
2. Bore holes for the sleeve with inner thread.
3. Clean the boreholes with compressed air.
4. Inject injection mortar into the boreholes.
5. Screw in sleeve with inner thread by hand to the bottom of the boreholes.
6. Wait for the curing time. Follow separate instructions.
√
The preliminary work has been completed. You can assemble the compo-
nents of the pedestrian gate.
ä
7.8
Mounting the MPT-333
The mounting of the turnstile on a base frame and the mounting of the turn-
stile directly on a foundation are identical in procedure. Only the attachment
material is partly different. The following figures show the installation with the
optional base frame.
Summary of Contents for MPT-333
Page 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Page 89: ...89 MPT 333...
Page 90: ...90 MPT 333...
Page 91: ...91 MPT 333...