53
MPT-333
Assembly
If the mounting pillar was ordered at the same time as the pedestrian gate, pull
wires are drawn in at the factory for the lines of the mounting pillar.
Additional steps for subsequent ordering of the mounting pillar
If the mounting pillar was ordered subsequently, you must carry out the fol-
lowing steps before mounting the mounting pillar:
1. Drill holes for the mounting pillars in the cage half.
600
10
1
Ø 10
Ø 30
45°
Mag00898
Ø 10
1052
1
Fig. 23: Required holes mounting pillar (all dimensions in mm)
1 Standard height for implementation by Magnetic
2. Pull the pull wires or lines for the mounting pillar through the outer sup-
ports of the cage half.
Summary of Contents for MPT-333
Page 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Page 89: ...89 MPT 333...
Page 90: ...90 MPT 333...
Page 91: ...91 MPT 333...