39
MPT-333
Assembly
min. 80
0
1
2
3
Mag00897
Fig. 13: Foundation and empty conduit plan for direct mounting – side view
(dimensions in mm)
1 Foundation C35/45 XD3 XF2 with reinforcement, foundation depth: at least 800 mm,
frost-proof
2 Empty conduit: Lay empty conduits separately for mains cable and control lines. Al-
low empty conduits to protrude approx. 50 mm above foundation and lines to pro-
trude at least 5 m from the empty conduits.
3 Foundation, smooth coating, even and horizontal
Summary of Contents for MPT-333
Page 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Page 89: ...89 MPT 333...
Page 90: ...90 MPT 333...
Page 91: ...91 MPT 333...