Assembly
7.5
Setting up foundation and placing empty conduits
7.5.1
Requirements foundation
The foundation must meet the following requirements:
›
Have sufficient load-carrying capacity
›
Concrete C20/25 or corresponding industrial floor
›
Attachment must be able to grip securely
›
Foundation cross section according to foundation and empty conduit plan
›
Non-slip surface
›
Horizontal and level.
Foundation and empty conduit plan for base frame FURA T3:
ä
10.
ä
Foundation and empty conduit plan for direct mounting:
ä
ä
For outdoor assembly, the foundation must meet the following additional re-
quirements:
›
Concrete C35/45 XD 3 XF2 with reinforcement
›
Foundation depth: at least 800 mm, frost-proof. Adapt foundation depth to
the local conditions.
7.5.2
Requirements empty conduits
Observe the following points for the empty conduits:
›
Place empty conduits according to the foundation plan.
›
Conduits have to be planned to a sufficient length.
›
Plan empty conduits required for access-control devices and other peripher-
al devices. The cabling for this is the responsibility of the customer.
IMPORTANT!
To ensure trouble-free operation, separate empty conduits must
be installed for all mains cables and control lines.
Foundation and empty conduit plan for base frame FURA T3:
ä
10.
ä
Foundation and empty conduit plan for direct mounting:
ä
ä
Summary of Contents for MPT-333
Page 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Page 89: ...89 MPT 333...
Page 90: ...90 MPT 333...
Page 91: ...91 MPT 333...