37
MPT-333
Assembly
15
0
1
3
4
2
A
4
1 2
3
min. 800
A
Mag0089
5
Fig. 11: Foundation and empty conduit plan for base frame FURA T3 – side view
(dimensions in mm)
1 Finished paving such as interlocking stones or cobblestones, flush with the attach-
ment plates
2 Gravel and sand layer
3 Base frame level and horizontal, fill any hollows under the base frame
4 Foundation C35/45 XD3 XF2 with reinforcement, foundation depth: at least 800 mm,
frost-proof
Summary of Contents for MPT-333
Page 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Page 89: ...89 MPT 333...
Page 90: ...90 MPT 333...
Page 91: ...91 MPT 333...