33
MPT-333
Assembly
7.3
Required steps
The following work steps must be carried out before assembly:
›
Specify the installation position.
ä
›
Set up foundation and placing empty conduits.
ä
The following work steps must be carried out during assembly:
›
Unpack the turnstile.
ä
›
Assemble and mount optional base frame.
ä
›
Assemble cage half and locking comb.
ä
›
Assemble the support beam.
ä
›
Assemble the centre pillar.
ä
›
Assembly of an optional mounting pillar for access-control devices.
ä
›
Connect the turnstile electrically.
ä
›
Install and connect access-control devices.
ä
7.4
Specifying the installation position
The turnstile MPT-333 is available in the versions "Entrance side right" and "En-
trance side left".
ä
The layout of the components depends on the version ordered. The service
door in the support beam should point towards the zone controlled.
Summary of Contents for MPT-333
Page 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Page 89: ...89 MPT 333...
Page 90: ...90 MPT 333...
Page 91: ...91 MPT 333...