2. Test Enable/disable rectifier restart feature.
3. Test HV shutdown level(s).
4. Test BD alarm levels.
5. Test other optional circuit packs.
Turn-up
Turn on and adjust all rectifiers for normal operation according
to the Rectifier manual.
Connect all loads, one at a time, by turning on the load circuit
breakers. If a circuit breaker trips immediately when turned on,
this may be due to inrush current and does not necessarily
indicate a fault condition. Attempt to close the circuit breaker a
second time. If the breaker trips again, check the wiring to the
load circuit and the instructions for powering up that load.
Warning
Before applying power to any individual load, follow the turn
up instructions provided in the associated load equipment
manual.
Figure 5-1: Typical Floor Mounting Detail for Battery Stands