Lucent Technologies ECS Minicell Battery Plant H569-420
3 - 14 Engineering and Ordering
Issue 5 February 1997
31. Order battery terminal plate assembly for Group 10 from
the table below. Each battery string requires one battery
terminal plate.
32. Refer to H569-407 for anchor bolt kit ordering
information. These kits are used to secure the battery plant
to the floor. The following table lists the recommended
anchor bolt kits based upon earthquake certification testing
information. The ordering information applies to both the
Group 1 and Group 2 bays.
Sample Orders
The following sample order corresponds to Figure 1-1 in
Section 1. The bay consists of a 46” top hat equipped with two
rectifier shelves, an ECS controller, a distribution panel with low
voltage disconnect, and a 24/48V converter shelf assembly.
Table 3-Q: Battery Terminal Plate Assembly
Description
Comcode
Battery Terminal Plate Assembly
601372550
Table 3-R: Anchor Bolt Kits
Earthquake Zone
H569-407
Comcode
0, 1, 2
Group 2
847135662
3, 4
Group 4
847315668
Sample Order, Figure 1-1
Item
Quantity
Description
1
1
H569-420 G-1 46” Framework E/W
1
Distribution Panel
1
G-6 ECS Controller
1
G-4 Rectifier Shelf Assembly 1
1
G-5 Rectifier Shelf Assembly 2
1
G-N Converter Shelf Assembly
2
6
10724V Rectifiers
3
1
407271824 1 String of 600AH Batteries and Stand
4
2
846481240 Battery Cable Kit
5
20
407098490 30 amp Circuit Breaker
6
10
407245448 40 amp Circuit Breaker
7
10
847301686 6 AWG Term. Lug Kit
8
20
847301678 8 AWG Term. Lug Kit