Lucent Technologies ECS Minicell Battery Plant H569-420
5 - 12 Installation
Issue 5 February 1997
Installation
Procedures for
Plant Growth
As your power needs evolve, equipment may be easily added to
the battery plant to provide any of the following.
•
Expanded controller features
•
Additional rectifier capacity
•
Increased battery capacity
•
Additional load circuits
Procedures for adding controller features, rectifiers and batteries
to an operating plant are described in the installation sections of
the associated subsystem manuals. The procedure to add load
circuits is described below.
Adding a Load
Circuit
The following procedure provides the steps to add a new load
circuit to an operating battery plant.
1. See Section 3 note 19 for details on obtaining additional
circuit breakers.
2. Alarms may be issued during the installation process (e.g.
by a new circuit breaker in the OFF position). Notify the
alarm reporting center of that alarms may be received.
3. Open the dc distribution cover panel, taking care not to
disturb any load-carrying circuit breakers.
Warning
Procedures in this section may cause power alarms to be
issued temporarily. Notify the alarm reporting center before
starting any installation procedure on a battery plant while it is
in service.
DANGER
Battery voltage is present behind the distribution cover panel.
Remove all jewelry before working in this area. Use insulated
tools only.