Lucent Technologies Galaxy Power System 4804AP H569-450
Issue 1 June 2000
Installation 11 - 17
Connecting Loads
Cable Routing
Strategy
As with any power system, cabinet positioning with respect to cable
racks, batteries, and the ac service is very important in order to ensure
easy installation, proper maintenance, and graceful growth of the system
in the future.
Cabinet is arranged to separate ac leads from dc leads to minimize
electrical noise transmitted to the load. Run ac cable in an ac conduit
mounted above the front of the cabinet. Route dc leads along a cable
rack above the back of the cabinet.
Large Circuit
Breakers
The circuit breakers of higher capacity using three poles in parallel need
a shorting link, which is used to short the three poles of the circuit
breaker. The output dc cable is connected to the shorting link.
Caution:
Turn OFF breaker before beginning procedure.
Connecting Load
Termination Cables
Connecting Load Termination Cables
Step
Action
1
Install alarm wires and load shunt wires to panel. (if not
pre-wired). Plug cable onto the output receptacle on the panel.
2
The circuit breakers are generally mounted to the dc
distribution panel. Connect the output cable to the output of the
circuit breaker with the pre-installed hardware. In case the
breaker is not installed, refer to installation of breaker.