Chapter 6 Installation and Wiring
6-6
(5) In case the equipment is installed in front of the PLC (inside the door) to avoid the effect of radiant noise or the heat, it is
required to separate it more than 100mm and be install.
And the left/right direction of the unit and the equipment should be separated more than 100mm and installed.
High
voltage
device
Other
machine
100mm above
Radiator
80mm or above
80mm or above
PLC attaching
Summary of Contents for XGL-PSEA