![Lombardini ECOWIND 350 C - EUR 12V Assembly And Installation Manual Download Page 136](http://html.mh-extra.com/html/lombardini/ecowind-350-c-eur-12v/ecowind-350-c-eur-12v_assembly-and-installation-manual_1938340136.webp)
62
THIS MANUAL IS PROPRIETY OF
ECOWIND by LOMBARDINI
- ALL FORMS OF REPRODUCTION, PARTIAL OR OTHERWISE, IS STRICTLY PROHIBITED
G
B
Fig. 143
PL
PS
D
S
TS
Fig. 142
Fig. 141
Fig. 144
PH
PS
ASSEMBLY AND INSTALLATION
- 3
PS: Access points on the gas circuit
PH + PL: Recovery taps on the charger / recovery station
TS : Service pipes
3.11 FILLING THE GAS CIRCUIT WITH R 134 A
Connect the
PL
and
PH
taps of the gas charger station
AC (not supplied)
to the relevant access points
PS
fig 143÷144
.
WARNING!
For a correct “system vacuum” operation, a time of at least 30 minutes and a calibrated gas charge in
accordance with that reported in the table 1 on page 11 (recommended).
COMPULSORY OPERATIONS!!!
Step Description
1
After mounting the split unit and the pipes, in order to ensure proper drainage of the condensation in the split unit, it is
OBLIGATORY to insert the condensation dissipation terminal into the end of the condensation drainage pipe and the
dissipater
D
into the support
S
, if not already inserted.
2
Attention!
Non-observance of this regulation could lead to drainage problems of condensation inside the vehicle cab!
Lombardini S.r.l declines all responsibility for damage to persons or things caused by non-observance of this
regulation.