8
3. WORK WITH THE DEVICE
3.1
Assembly of the device
1.
Take from wardrobe trunk SSHP, BP, BUOI, BAPP I/II, cable BP and cable BAPP;
2.
Choose the required BAPP according with the depth of search. At depth up to 1 m - BAPP II, from
1 up to 3 m – BAPP I;
3.
Fix BAPP on the foldable handle rod in such away that spring-force fixing ledge of foldable
handle rod is to be correspond to the socket of the supporting element on the BAPP case (figure
3.1.1);
Figure 3.1.1. BAPP Supporting to the folding handle rod.
4.
Rotating clock-wise twist completely charged off-line power supply (BP) unit on the folding
handle rod (figure 3.1.2);
Figure 3.1.2. BAPP Supporting to the folding handle rod.
BP
Supporting node of BP on
the folding beam-hand
Spring - force fixing ledge
of folding
handle rod
Fixing clutch of position of
retractable element
of folding beam-handle
Bolt fixing the corner of
deflection on BAPP
BAPP I/II