
15
4 Installation
4.3 Connecting the Unit
Pay attention to a stabile power supply of
nominal 230 V AC and
minimum 220 V AC, 50 Hz.
•
Connect connections cord
3
and
supplied power cord.
4.4 Startup in Cold Conditions
•
Press power button. Power button will illuminate.
•
Wait approx. 3 minutes for warm-up of the UV-bulb to the operating temperature.
Then the system is ready for curing.