Chapter 3: Procedures
3-15
HYDROBAR EXPRESS 220
Step 24: Close the channels by pressing the yellow button on the YV2B air valve.
YV2B valve
Press this
yellow button
Step 25: Place the alignment tube onto the alignment bar.
Alignment tube
Step 26: Mount the alignment tube to the t-tube mounting plate with the three bolts. (Third bolt is not visible)
Mount with bolts
Step 27: Tighten the four mounting bolts on the t-tube mounting plate to the rest.
Summary of Contents for Hydrobar Express 220
Page 61: ......
Page 143: ......
Page 147: ......
Page 156: ...Chapter 6 Spare Parts 6 9 HYDROBAR EXPRESS 220 Servo Motor Assembly ...
Page 161: ...6 14 Chapter 6 Spare Parts HYDROBAR EXPRESS 220 Hydraulic Pump Assembly ...
Page 163: ...6 16 Chapter 6 Spare Parts HYDROBAR EXPRESS 220 Diameter Adjustment Motor Assembly ...
Page 164: ...Chapter 6 Spare Parts 6 17 HYDROBAR EXPRESS 220 Air Regulator and Cable Passage Plate ...