-59-
〇
“Receive test” with X-ON/X-OFF flow control
1) When the analyzer is DTE mode, RTS and DTR will become active. When the analyzer is DCE mode, CTS,
DSR an DCD become active.
2) If the "Initial state" is “ON”, it will start the data transmission immediately. If the "Initial state" is “OFF”, it
will start the reception after the period of “OFF time” and receiving X-ON character.
3)Transmit X-OFF character when it receives data is reached to the number set at “ON count”. And transmit
X-ON character when it passes the time set at “OFF time”.
〇
“Receive test” with handshake flow control
1) If the “Initial state” is “ON”, it will make the selected control line active immediately. If the "Initial state" is
“OFF”, it will make the selected control line active after the period of “OFF time”. When the analyzer is DTE
mode, RTS (or DTR) is used. When the analyzer is DCE mode, CTS (or DCD) is used.
2) It makes the selected control line active when number of received data reaches to the number set at “ON
count”. And it makes the selected control line non-active after the period of “OFF time”.
During “send test”, the number of data transmitted from starting
to interrupting data transmission will be displayed on the screen
for sixteen times.
(When it is over 999999, the message “OVER” will be appeared.)
There might be some data transmitted after having the interrup-
tion of data transmission.
During “Receive test”, transmission/reception data are displayed
on the screen at real time.
Press [STOP] to end the test.