70
1.
Disassemble the top plate.
2.
Remove the cover cabinet.
3.
Remove the filter and 2 screws.
4.
Remove the air duct.
AIR DUCT
1.
Disassemble the top plate.
2.
Remove the cover cabinet and tub drum [front].
3.
Remove the drum assembly and tub drum [rear].
4.
Disconnect the air duct from the tub drum [front].
5.
Remove the roller from the tub drum [front]
and tub drum [rear].
Rollers
Summary of Contents for GDL1329CED3
Page 13: ...13 4 INITIAL STEPS FOR INSTALLING YOUR DRYER ...
Page 14: ...14 ...
Page 15: ...15 ...
Page 16: ...16 ...
Page 17: ...17 ...
Page 28: ...28 ...
Page 29: ...29 6 ELECTRICAL REQUIREMENTS FOR ELECTRIC DRYERS ...
Page 36: ...36 9 EXHAUST REQUIREMENTS AND MAINTENANCE ...
Page 40: ...40 10 DRYER CYCLE PROCESS ...
Page 42: ...42 44 ...
Page 43: ...43 ...
Page 44: ...44 12 MOTOR DIAGRAM AND SCHEMATIC Centrifugal switch Centrifugal switch Pull Drive forward ...
Page 45: ...45 13 CONTROL LAY OUT PWB ASSEMBLY DISPLAY LAY OUT PWB ASSEMBLY LAY OUT ...
Page 50: ...50 ...
Page 51: ...51 Trouble Symptom Measurement Condition Air TEMP RES k Air TEMP RES k Air TEMP RES k ...
Page 55: ...55 Trouble Symptom Measurement Condition ...
Page 56: ...56 Trouble Symptom Measurement Condition ...
Page 57: ...57 16 ERROR MODE ...
Page 61: ...61 18 CHANGE GAS SETTING NATURAL GAS PROPANE GAS ...
Page 62: ...62 ...
Page 71: ...71 EXPLODED VIEW 20 20 1 1 Control Panel Plate Assembly Coin OPL Type A210 A120 A116 A110 ...
Page 72: ...72 20 1 2 Control Panel Plate Assembly Card Type A210 A120 A117 A116 A110 ...