-84-
Copyright ©
LG Electronics Inc. All rights reserved.
Only training and service purposes
Failures and measures
+ -
No
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
2. No dust emptying operation is carried out (1/3)
Check Point
Check if the power
is normal.
(Operating time:
Approximately 10 seconds)
Check if the
product body is
detected
Check settings
and the terminal
power.
Checkpoints
Measures
Does a buzzer sound when
the power cord is connected
initially?
(Display LEDs light in order)
Is the initialization (sealing motor
operation) carried out when the
power cord is connected initially?
Does the cycle begin when
the Start button is pressed?
<No sealing operation>
<Sealing operation>
Is 4~6V measured at
the charging terminal
of the product body?
Measure the terminal
voltage (4~6V).
Does the dust emptying cycle
begin automatically along with
a buzzer sound from the
product body when the
product body is mounted after
the sealing motor is initialized?
Is the automatic mode set?
Move to
“4-1. No power
supply”.
Move to “4-2.
Display
failure”.
Move to “3.
Charging failure”
and check again
Reassemble and
check the Display
PCBA, and then check
again if the product
body is detected.
Reinstall the
product body and
check again to see
if the product body
is detected.
“Move to 4. Dust
emptying
operation (2/3)”
“Move to 4. Dust
emptying
operation (2/3)”