Heat pump 50Hz/R410A
_
58
3. Installation of outdoor unit
Part 3 Design and installation
Branch kit(PMBL1203F0)
Thermal insulation work
• Securely wrap the refrigerant and the branch pipe by using thermal insulation materials provided.
When using thermal insulation materials released, use withstand heat insulation materials.(thickness
of more than 10mm)
• Securely adhere thermal insulation materials wrapping the branch pipe so that they do not widen.
After wrapping them with auxiliary materials , bound them with a band .
• Finish the work by wrapping with a vinyl tape after the insulation material work.
• When installing the branch pipe, direction and angle of installation is not limited.
• Take care so that burrs and foreign material may not enter into the cutting surface when connecting.
Thermal insulation materials
Thermal insulation materials
Thermal insulation materials
Thermal insulation
materials
Vinyl Tape
Vinyl Tape
Vinyl Tape
Vinyl Tape
Band
Band
Band