Note:
Items marked with asterisk (*) are available on some models only.
•
1
Server
•
2
Rail kit*. Detailed instructions for installing the rail kit are provided in the package with the rail kit.
•
3
Cable management arm*
•
4
Material box, including items such as accessory kit, power cords* and documentation
Cable the server
Attach all external cables to the server. Typically, you will need to connect the server to a power source, to
the data network, and to storage. In addition, you will need to connect the server to the management
network.
Connect to power
Connect the server to power.
Connect to the network
Connect the server to the network. Typically:
• Ports 1 and 2 on the server are connected to the data network.
• One of the ports on the network is connected to the management network (if there is a separate data and
management network).
Connect to storage
Connect the server to any storage devices.
30
User Guide for ThinkAgile HX2320 Appliance and HX2321 Node
Summary of Contents for ThinkAgile HX2320 Appliance
Page 4: ...ii User Guide for ThinkAgile HX2320 Appliance and HX2321 Node ...
Page 16: ...12 User Guide for ThinkAgile HX2320 Appliance and HX2321 Node ...
Page 32: ...28 User Guide for ThinkAgile HX2320 Appliance and HX2321 Node ...
Page 38: ...34 User Guide for ThinkAgile HX2320 Appliance and HX2321 Node ...
Page 86: ...82 User Guide for ThinkAgile HX2320 Appliance and HX2321 Node ...
Page 90: ...86 User Guide for ThinkAgile HX2320 Appliance and HX2321 Node ...
Page 92: ...88 User Guide for ThinkAgile HX2320 Appliance and HX2321 Node ...
Page 94: ...90 User Guide for ThinkAgile HX2320 Appliance and HX2321 Node ...
Page 96: ...92 User Guide for ThinkAgile HX2320 Appliance and HX2321 Node ...
Page 99: ......
Page 100: ......