Page 7
KHA180, 240
Unit Power−Up
A−General
1− Make sure that unit is installed in accordance with the
installation instructions and applicable codes.
2− Inspect all electrical wiring, both field- and
factory-installed, for loose connections. Tighten as
required.
3− Check to ensure that refrigerant lines do not rub
against the cabinet or against other refrigerant lines.
4− Check voltage at disconnect switch. Voltage must be
within range listed on nameplate. If not, consult
power company and have voltage condition
corrected before starting unit.
5− Make sure filters are in place before start-up.
6− Apply power to unit.