Applications
FlexLine, 129
Next step
•
Either, press
ALL
to measure and record.
•
Or, press
ESC
to return to the
DEFINE GRID
screen and from there, press
PREV
to return to the
REFERENCE LINE - MAIN
screen.
Δ
Height difference from the measured point to the stake out point.
Positive if the stake out point is higher than the measured point.
Δ
Line
Longitudinal distance from the measured point to the stake out point.
Positive if stake out point is further away than the measured point.
Δ
Offset
Perpendicular distance from the measured point to the stake out
point. Positive if stake out point is to the right of the measured point.
Field
Description