107
Programs
Leica TPS800-4.0.0en
Description of fields
S
Ch.
Difference between defined chainage
and current measured chainage.
S
Offs.
Horizontal offset between catch point
of defined slope and current
measured position.
Cut/Fill
Vertical offset between catch point of
defined slope and current measured
position. A cut is above the slope, a fill
is below the slope.
PtID :
P4
hr : 1.500
M
Def.Chain : 102.000
m
Ch.
:
10.000 m
Offs. :
2.742 m
Cut :
2.742
m
Act. Slp : 1: 1.502 v:h
IR
I
ALL
DIST
REC
SLOPE STAKE OUT 1/3
Act. Slp
Actual Slope, the current measured
slope of the reflector position to the
hinge point.
Offs. Hng
Offset to Hinge, the current measured
offset to horizontal alignment
including offset right and offset left.
S
H Hng
Height difference to Hinge, the
vertical offset between current
defined height at current chainage
and current measured position
including defined height difference.
Hng
Slope distance to Hinge, the slope
distance from the current measured
point to the hinge point.
Height
Height value of the current measured
point.
Act. Ch.
Current measured chainage.
Offs. Aln
Offset to Alignment, the current
measured offset to horizontal align-
ment excluding offset right and offset
left.