102
Programs
Leica TPS800-4.0.0en
4b Sub application Stake
The sub application
Stake
is used to stake out
points relative to an existing horizontal alignment.
P1 Target Point
P2 Measured Point
P3 Measured Point
a
Horizontal alignment
b
Defined Chainage
c
Offset
d
Height Difference
e
S
Offset, is positive when target point is on the
right hand side of the measured point.
f
S
Chainage, is positive when target point is
further away than the measured point.
g
S
Height, is positive when target point is higher
than the measured point.
TPS800_Z117
a
d
e+
e-
f+
f-
g+
g-
c
P1
P2
P3
b
PtID :
A3
hr :
1.500
m
Offset :
Center
Def.Ch. :
102.000
Chain :
2.305 m
Offset :
1.367 m
Height :
0.100 m
IR
I
ALL
DIST
REC
EDM
3D-ROAD STAKE OUT 2/2