Page 52 of 61
6. Remove the retainer of the drop production body:
Attention
It is important to remove screw
1
before screw
2
.
Remove screw
1
Remove screw 2
7. Remove the old drop production body
8. Mount the new drop production body back on the adapter of the ground plate.
9. Mount screw
2
first, then screw
2
.
10.
Please note:
Do not tighten the screws. First, the drop production body has to adjusted in a
correct position.
Mount the new drop production
body back on the adapter of the
ground plate.
Mount screw
2
first.
Mount screw
1
1
2
2
1