Spartan 730/730IS Dosimeter Manual
Making a Measurement
49
4.1.1 Pausing a Measurement in Progress
Pausing a measurement in progress temporarily stops the meter from
measuring noise levels and halts the run time clock. Resuming the
measurement also resumes the run time clock.
Before you begin:
•
Begin a measurement as shown in
,
or begin the measurement from the LD Atlas app or G4.
Step 1.
With a measurement in progress, press and hold
select
to enter the
Menu.
Step 2.
Highlight, then
select
Pause
. The measurement is paused.
To Resume the Measurement:
4.1.2 Stopping a Measurement in Progress
TRY THIS
You can merge 2 or
more files in the LD Atlas app or
G4. For more information, see the
When you stop a measurement, all data from that run time segment is
saved in a single data file. When you start the next measurement, the
dosimeter saves the subsequent data in a new file.
Before you begin:
•
Begin a measurement as shown in section
, or from the LD Atlas app or G4.
In this section, use
UP
or
DOWN
on the dosimeter to
highlight an option. Use
SELECT
to set the option.