9
1.4 INSTALLATION OF THE UNIT - CONTINUED
B. FONT INSTALLATION
1. Route ribbon cable, harness, and syrup/water lines through hole in the Tray Assembly
(Fig
3a).
2. Guide font shank through hole in the drip tray (Fig 3b). Position the font with the Selection
Buttons and Nozzle above the Drip Tray.
3. Route Ribbon Cable, Wire Harnesses and Plumbing Lines through the nut. Next, thread nut
on shank and tighten to secure font to counter (Fig 3c).
NOTE:
To avoid damage to the ceramic lever, use caution to avoid over tightening.
Figure 2. Unit Overview
Figure 3. Font Installation
Figure 3a
Figure 3b
Figure 3c
Summary of Contents for 85-3151R-VV
Page 28: ...28 8 4 WIRING DIAGRAM LFCV...
Page 33: ...33 8 9 WIRING DIAGRAM VV...
Page 34: ...34 8 10 COUNTER CUTOUT TEMPLATE not to scale...
Page 35: ...35 NOTES...