HM-JACKarc Operation Manual
Analysis Operations
5 - 1 Rev.4
5
Analysis Operation
5.1 Flow of Analysis Operation
Routine analysis operation follows the process described below.
1.
Turn on the Analyzer (and Log in optional)
Turn the Analyzer on about an hour before the start of analysis, to allow
it to warm up.
Use of Sleep Mode can avoid the need for this warming-up period.
2.
Prepare Detergent in the Wash Tank
3.
Prepare the Waste Tank and Cell Dust Box
Empty the Waste Tank / Cell Dust Box if necessary.
4.
Prepare the Reagent
Let the Latex Reagent warm to room temperature before use.
Set the reagent volume on the Sample Order screen, if necessary.
5.
Prepare the Buffer
Let the Buffer warm to room temperature before use.
6.
Prepare the Reaction Cells
If required, use the Cell Set screen to set the starting position for
picking up the cells and replacing used cells.
7.
Prepare for calibration
When Latex lot is changed, register Master Curve. When the Calibrator
lot is changed, register barcodes of Calibrator Card.
8.
Prepare the Calibrators (S1, S2)
If calibration is necessary, prepare the Calibrators.
9.
Prepare the Controls (CL, CH)
10.
Prepare the Patient Samples
Set the Patient Samples in Collection Picker or Sample Cup in the
Sample Racks.
10.
Load Racks
Load Racks equipped with required materials.
11.
Analysis
12.
Completing Analysis