
4. Calibrations
4.1 Actuators calibration
After changing/repair an actuator or PCB or after memory error on the system, the actuators most be calibrated again.
For an good calibration process please follow the steps below:
Go to screen “hopper & act calibration
Select “CAL” button and press OK
The actuator should open and close (Emergency stop, press OK again)
Press the other “CAL” button for the other actuator
Values must be (after calibration) approximately between 15 and 1015
Calibrate all the 2 or 4 actuators (depending on machine configuration)
When calibrating is not possible or value’s are not close to the 15 and 1015 please check and measure the actuators
(see §2.6)
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
46
Summary of Contents for EDW2
Page 3: ...1 System overview 3 ...
Page 9: ...1 1 5 1 Battery cable 9 1 System overview ...
Page 10: ...Relay connections Not available on spare parts 1 1 5 1 Battery cable 10 1 System overview ...
Page 11: ...2 1 5 2 IM Tellus connection cable 11 1 System overview ...
Page 12: ...1 5 3 ISOBUS connector 3 12 3 5 2 1 6 4 7 8 9 1 System overview ...
Page 13: ...1 6 Communication and power cables Machine side 13 1 System overview ...
Page 32: ...3 1 Machine Software overview EDW ISO II 1 19 3 Software screens 32 ...