ON-3V: Stacker Process Summary
2-5
KVAL Manual
The Door is moved to the Stacking Area
6.
The
Lifting Pads
raise the door. (Some options may have the rotate)
7.
The
Boom
moves the door over the
Stacking Area
.
8.
The next door is fed in and process repeats.
Move Stacked Doors out of Staging Area
• Temporarily disable the safety circuit is by selecting the
Request Access Button
.
See “Staging Area Controls” on page 2-11
• Move the door stack in the staging area.
• At the Main Menu, program door process. and start the process.
Door is Lifted
Door may be Rotated if
machine has this option
Door is Lifted
Remove Door Stack
Summary of Contents for ON-3V
Page 3: ...KVAL ON 3V Operation Manual KVAL ON 3V Operation Manual Your Feedback is Welcome NOTE ...
Page 4: ...KVAL ON 3V Operation Manual ...
Page 8: ...KVAL ON 3V Operation Manual Table of Contents ...
Page 23: ...Getting Help from KVAL 1 15 KVAL Manual Page Intentionally Left Blank ...
Page 68: ...Appendix About Switches and Sensors 3 20 KVAL Manual ...
Page 70: ...Index Kval ON 3V ...
Page 71: ......