MDX [en-US]
12
3.2.4
Removal from Storage
Remove rust from machined surfaces using a wire brush.
Remove rust inhibitor from all machined surfaces prior to installation/assembly.
Check the painted surfaces for any signs of corrosion or breaks in the coatings and touch-up as needed.
It is recommended that the bearing assembly be drained before shipment and refilled after relocation or installation.
If GIW Blue Oil with rotation was used and the pump is stored for less than 12 months, the same oil may be used for
initial commissioning and break in. Otherwise, it is recommended that the oil be replaced prior to commissioning to
remove any moisture.
If GIW Storage Oil was used, it should be drained and replaced with GIW Blue Oil before start-up.
For grease lubricated units, a fresh application of grease in the amount recommended by the maintenance manual for
a normal lubrication interval should be applied.
Stuffing Box should be checked before start-up and replaced if necessary. Packing may have dried out and need
multiple readjustments during the start-up process.
If the pump is fitted with a mechanical seal, motor, sheave, bushing, coupling, gear reducer, or other auxilarily
equipment be sure to consult the manufacturer’s maintenance manual for any additional storage removal and
commissioning instructions.Consult the Section 6 "Commissioning" before putting the pump into service.
Summary of Contents for GIW MDX
Page 53: ...MDX en US 53 14 Notes...