6 Commissioning/Start-up/Shutdown
35 of 78
Etanorm-R
1222.8/13-EN
1
2
3
4
5
Fig. 17:
Bearing bracket with constant level oiler
1
Constant level oiler
2
Vent plug
3
Connection elbow of the constant level
oiler
4
Screw plug
5
Bearing bracket
1. Pull out the vent plug (2).
2. Hinge down the reservoir of the constant level oiler (1) from the bearing
bracket (5) and hold it in this position.
3. Fill in oil through the hole for the vent plug until the oil reaches the connection
elbow of the constant level oiler (3).
4. Completely fill the reservoir of the constant level oiler (1).
5. Snap the constant level oiler (1) back into its operating position.
6. Fit the vent plug (2) again.
7. After approximately 5 minutes, check the oil level in the glass reservoir of the
constant level oiler (1).
The oil reservoir must be properly filled at all times to ensure that the correct oil
level is maintained. Repeat steps 1 - 6, if necessary.
8. To check the function of the constant level oiler (1), slowly drain some oil via the
screw plug (4) until air bubbles can be seen in the oil reservoir.
NOTE
An excessively high oil level can lead to a temperature rise and to leakage of the
fluid handled or oil.
6.1.3 Priming and venting the pump
DANGER
Risk of potentially explosive atmosphere inside the pump
Explosion hazard!
▷
The pump internals in contact with the fluid to be handled, including the seal
chamber and auxiliary systems, must be filled with the fluid to be handled at all
times.
▷
Provide sufficient inlet pressure.
▷
Provide an appropriate monitoring system.
Summary of Contents for Etanorm-R
Page 1: ...Standardised Pump Etanorm R Installation Operating Manual...
Page 77: ......