7 Operation
29 of 80
KSB Delta Primo
1983.811/02-EN
7 Operation
CAUTION
Incorrect operation
Water supply is not assured!
▷
Make sure to comply with all local regulations, particularly the EC Machinery
Directive and the EC Directive on Low-Voltage Equipment.
The pressure booster system is factory-set to the start-up pressure and stop pressure
indicated on the name plate. Changes and restorations can be made via the control
panel. (
7.1 Control panel
1
2
3
4
5
Fig. 7:
Control panel
1 Display
2 LED display
3 Function keys
4 Navigation keys
5 Service interface
7.1.1 Display
The display contains the following information:
Fig. 8:
Display elements
Summary of Contents for Delta Primo F
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ...KSB B V Kalkovenweg 13 2401 LJ Alphen aan den Rijn Netherlands 1983 811 02 EN...