A - 8
Appendix
4
2
1
KDW04211
II
I
3
Installing the front tarpaulin
•
Suspend the eyes from the hooks (4) on the front
panel.
The two outer hooks each take two eyes.
1. To do this, fold the tarpaulin upwards and over on one
side and place the eyes (1) in the hooks (2).
2. Next, place the rope ends on the hooks.
The two outer hooks (2) each take two rope
ends (3).
A1.3.1 Installing the ropes
•
Starting from the back, guide the rope (2) through the
eyes (1) of the tubular hoops.
•
From below, guide the rope through the eyelets in the
tarpaulin and place it on the hooks on the front panel.
The two outer ropes are also threaded
through the two side eyelets in the
tarpaulin.
•
Lay the tension ropes (3) and (4) round the front tubular
hoop.
•
Hook the tension rope hooks (3) and (4) in the eyelets
of the tarpaulin.
KLW07191
3
4
5
2
1
Summary of Contents for 4XL-RGL
Page 4: ...Foreword ...
Page 10: ...I 4 General information ...
Page 15: ...II 5 Safety ...
Page 20: ...II 10 Safety ...
Page 38: ...III 18 Operation ...
Page 44: ...V 4 Operator friendly solenoid control unit ...
Page 48: ...VI 4 Hydraulic system 6 2 3 Hydraulic unit standard ...
Page 49: ...VI 5 Hydraulic system 6 2 4 Hydraulic unit operator friendly ...
Page 52: ...VI 8 Hydraulic system ...
Page 68: ...VII 16 Maintenance ...
Page 70: ...VIII 2 Overwintering ...
Page 72: ...IX 2 Recommissioning ...
Page 74: ...X 2 Faults causes and removal ...
Page 83: ...A 9 Appendix A2 Electrical circuit diagram Standardoperation ...
Page 84: ...A 10 Appendix Operator friendlyoperation ...
Page 85: ...A 11 Appendix ...
Page 86: ...A 12 Appendix ...
Page 87: ...A 13 Appendix ...