Estimated traction load on the probe
3.8 How to install the instrument on the tank
3.8.1 How to install an instrument with a flange connection
Equipment needed:
•
Instrument
•
Gasket (not supplied)
•
Wrench (not supplied)
•
Make sure the flange on the nozzle is level.
•
Make sure that you use the applicable gasket for the flange and the process.
•
Align the gasket correctly on the flange facing of the nozzle.
•
Lower the probe carefully into the tank.
i
For more data on cable probes, refer to
How to install a cable probe in the tank
on page 44.
•
Tighten the flange bolts.
i
Refer to local rules and regulations for the correct torque to apply to the bolts.
Material
Probe length, 33 ft
Probe length, 65 ft
Probe length, 98 ft
[lbs]
Cement
2200
4410
6520
Fly ash
1100
2200
3300
Wheat
660
1320
2650
Figure 3-33:
Flange connection