Step 4
Adjust the position of the base braces
so that the erected fold-ing unit can be
placed on them. Secure the connec-
tions with gravity pins. Firmly tighten
the nuts at the base braces. Using a
spirit level, check the scaffold for pro-
per vertical and horizontal alignment of
both its short and long sides. To adjust
the height at the castors, proceed as
shown in the figures below.